202

MARC Brunswick service resumes

WASHINGTON — MARC service is operating again on the Brunswick Line after a downed tree on the tracks between the Brunswick station and the Point of Rocks station shut down service Monday morning.

During the shutdown, all trains were effected except for Frederick trains, which operated normally.

Metro accepted Brunswick Line MARC tickets Monday.

On Virginia Railway Express, flooding is causing problems for trains. Some are delayed up to 25 minutes.


Like WTOP on Facebook and follow @WTOP on Twitter to engage in conversation about this article and others.

© 2018 WTOP. All Rights Reserved. This website is not intended for users located within the European Economic Area.



Advertiser Content