Metro aims for September Silver Line opening despite construction issues
Faulty concrete panels that frame most of the new Silver Line stations may need to be inspected every three months after Metro takes ownership of the line if the panels are not fully replaced.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed