More changes coming to I-66/Beltway interchange

Hank Silverberg, wtop.com

FALLS CHURCH, Va. – Construction near the intersection of Interstate 66 and the Capitol Beltway has been a major problem for a while now but congestion has increased as the new High Occupancy Toll Lanes (HOT) get closer to completion.

A particular rough spot is right at exit 49 from the Outer Loop of the Beltway to I-66 west. The configuration has changed several times and now it’s going to change again. The two-lane ramp will become a one-lane ramp to create room for a third through lane on I-66 west.

That area has been a particular bottleneck in the afternoon rush hour.

Eventually there will be three through lanes and one High Occupancy Vehicle (HOV) lane for westbound I-66.

Creating the third lane on I-66 west could ease the traffic flow in an area that is often congested. This latest work is scheduled for completion this summer.

Follow Hank and WTOP on Twitter.

(Copyright 2012 by WTOP. All Rights Reserved.)

Federal News Network Logo
Log in to your WTOP account for notifications and alerts customized for you.

Sign up