Comment
0
Tweet
2
Print
RSS Feeds

Bay Bridge safety measures to be taken

Thursday - 4/18/2013, 4:40pm  ET

BALTIMORE (AP) -- The Maryland Transportation Authority on Thursday announced plans to install added safety measures for two-way traffic operations on the Bay Bridge.

The authority made the announcement on Thursday. The changes are based on a safety study the agency made last year.

Crews are scheduled to remove and replace rumble strips and pavement markings and add new signs starting as soon as Friday to provide additional visual and physical guides to help drivers stay alert and in their lanes during two-way operations.

The authority says the change will be gradual as crews first remove the existing rumble strips and pavement markings. They will then install the new lane markings and rumble strips. The work is expected to last about one week. It will be performed overnight when weather permits.


Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Tags: bay bridge