County to Add Bike Lane, Remove Travel Lanes from S. Eads Street

Diagram of potential S. Eads Street improvements Image via Google Maps Diagram of potential S. Eads Street improvements Diagram of potential S. Eads Street improvements Eads Street Pilot Program Example Cross-Section Cross-section of potential S. Eads Street improvements

(Updated at 11:05 a.m.) Arlington will be rolling out a pilot program for S. Eads Street this fall that will give residents an idea of what the future of the Pentagon City/Crystal City corridor will look like for years to come.

The county has decided that the four-lane road, which runs parallel to Jefferson Davis Highway from Army Navy Drive to Four Mile Run, is unnecessarily wide, and should be changed to a three-lane road — the center lane for left turns — with increased pedestrian and bicycle amenities.

The county’s Department of Environmental Services recently released a survey asking residents which plan for S. Eads Street they prefer: a regular bike lane with a buffer and a larger parking lane, a street-level “cycle” track with a physical buffer, or a “raised cycle track” with a larger barrier less space for both parked and driving cars. The survey will be open until June 18.

“The reallocation of the available street space allows for other uses such as widened sidewalks, bicycle facilities, pedestrian median refuges, and on-street parking, all to meet the existing and future needs of S. Eads Street,” the county writes at the beginning of the survey. “This pilot program will include many elements that may be included in the final design of S. Eads Street. During the pilot, various aspects of roadway operations will be monitored, including travel times and vehicle, bicycle and pedestrian traffic counts.”

The pilot program this fall will reduce the traffic to three lanes and institute a “protected bike facility,” as well as increased pedestrian crossings and reconfigured parking. The program will be installed between 15th Street and 23rd Street S., according to DES spokesman Eric Balliet, and most closely resemble “Option 2,” which includes the street-level cycle track. Balliet said the dimensions of the program will differ from those presented as the long-term Option 2 changes.

The Crystal City Sector Plan calls for increased density along parts of S. Eads Street closer to Army Navy Drive, which is also a part of the alignment for the Crystal City streetcar. There will be a meeting for residents to discuss their thoughts and concerns over the future of S. Eads Street on Wednesday, May 21, at 7:00 p.m. at the Aurora Highlands Community Center (735 18th Street S.).

Federal News Network Logo
Log in to your WTOP account for notifications and alerts customized for you.

Sign up